Most bathroom refits do not need approval. Here are the parts of the job that can.

A question that comes up a lot when planning a new bathroom is whether it needs building regulations approval. The short answer is that most like-for-like replacements do not. LABC, which represents local authority building control teams, says the majority of domestic like-for-like replacement kitchens and bathrooms will not need approval. But some parts of a bathroom job can, and it is worth knowing which before work starts.

This guide covers England. Rules differ in Wales and Scotland.

Electrical work (Part P)

Electrics are the part of a bathroom refit most likely to be notifiable. Under Part P, the following electrical work is notifiable:

  • Installing a new circuit, such as for an electric shower.
  • Replacing the consumer unit.
  • Adding to or altering existing circuits in a special location. A room with a bath or shower is a special location. LABC describes the area that matters as the zones around the bath or shower, up to 2.25 metres from the floor and within 600mm of the bath or shower tray.

Notifiable work can be done by an electrician registered with a competent person scheme, who self-certifies it and notifies building control, or it can be inspected by building control for a fee. Ask how the electrics are being handled when you get your bathroom quote.

Drainage (Part H)

Replacing a toilet, basin or bath in the same position, using the existing waste, is usually just plumbing. According to LABC, relocating sanitary fittings can need approval if it involves altering or connecting to a drainage stack or an underground drain. Moving a toilet across the room is the common example, because a toilet needs a large waste pipe with a proper fall to the soil stack.

Water supply (Part G)

New hot and cold supplies run to relocated fittings fall under Part G, which covers things like hot water safety. In practice this is about the work being done properly to the regulations, rather than a separate application for a simple refit.

Ventilation (Part F)

Bathrooms produce a lot of moisture. Building Regulations guidance sets a minimum intermittent extract rate of 15 litres per second for a bathroom extractor fan. The general rule from LABC is that new work must not make ventilation any less compliant than it was before. If you are replacing an old, noisy or weak fan, it is a good moment to fit one that actually clears the steam. If a new fan needs a new circuit, that is notifiable electrical work.

The boiler and hot water

A new bathroom is often when people think about the boiler, particularly if they are adding a bigger shower. Moving the boiler, extending its flue or installing a new gas appliance needs Building Regulations approval, and a Gas Safe registered engineer notifies the work. Replacing a boiler is notifiable too. Combi or system boiler covers which type copes better with more than one shower.

Structural work and windows

  • Removing or altering a load-bearing wall to make the bathroom bigger needs approval and usually a structural design.
  • Replacing a window or external door needs approval, although an installer registered with a competent person scheme can self-certify it.

Listed buildings and planning

Building regulations and planning permission are separate things. Internal work like a new bathroom does not normally need planning permission. If your home is listed, check with the council before starting. Installing a new bathroom does not usually need listed building consent, but work that removes or alters historic features such as doors, fireplaces or old plasterwork can. If you live in an older property and are not sure whether it is listed, it is worth finding out first.

Practical points

  • Keep the certificates for any notifiable work. Buyers' solicitors ask for them when you sell.
  • Decide on the layout before work starts. Moving a toilet halfway through is how a simple refit turns into a drainage job.
  • If you are thinking of replacing the bath with a walk-in shower, walk-in shower or bath covers the drainage and water supply questions.

The same rules apply to kitchens, and planning a new kitchen covers the kitchen-specific points.

Bathroom renovations in Tenterden and Ashford

I fit full bathrooms across Tenterden, Ashford and the surrounding area, from strip out to finished tiling. You will be told up front which parts of your job, if any, need notifying and how that is being handled. See bathroom renovation, kitchen installation or boiler installation, or call for a free quote.

Common questions

Does a new bathroom need building regulations approval?

A like-for-like replacement usually does not. Electrical work in the bathroom zones, new circuits, some drainage changes and boiler work can.

Is bathroom electrical work notifiable?

Adding to or altering circuits in the zones around a bath or shower is notifiable, as is a new circuit or a new consumer unit.

Do I need planning permission for a new bathroom?

Not normally for internal work. If your home is listed, check with the council before work that affects historic features.